Enter your figures
Enter the values below to calculate your result.
Calculation Results
Based on the figures you entered.
CPI
1.091
ReferenceAbove 1.00
CPI = EV ÷ AC. In earned-value management, 1.00 is the cost-performance reference point.
Calculate the earned-value cost performance index.
Enter the values requested in each field: Earned value (EV); Actual cost (AC). Keep time units, work calendars, and currency amounts consistent, and follow any field notes and validation messages.
The result summarizes project value, actual cost, schedule performance, cost performance, variance, or forecast cost using the earned-value and cost figures entered. Confirm the project reporting date and that planned value, earned value, and actual cost use the same scope and currency.
Use this to monitor project performance and estimate remaining or final cost. Results depend on the selected forecasting method and the quality of progress estimates; update the figures at each reporting period.